Balikpapan, Kalimantan, Indonesia

Balikpapan, Kalimantan, Indonesia

1. Construction date : 2011/02/23 ~ 2011/02/25

2. Construction location : Balikpapan, Kalimantan, Indonesia

3. Orderer : Ministry of Public Works of Indonesia

4. Size : Width – 3.0m x 2 lanes = 6.0mRoad length – Total 100.0m, Surface soil stabilization layer 30cm

5. Note : As part of a project to relocate the capital of Indonesia, Jakarta to the island of Kalimantan, this road was built as a testing pavement using soil stabilizer.

Contact us

EMAIL : hdbyun@hanmail.net / hdbyun@gmail.com

ADRESS : ASK Tower 929, 37, Digital-ro 10-gil, Geumcheon-gu, Seoul, Republic of Korea

*The developer, inventor, and patent holder (intellectual property rights) of the product names PST-100, USM-100, USH-100, ESS-100, PSC-100, and GIANTMIX-100 is BYUN HO DEOK, the C.T.O of IT’s ST Co., Ltd.

en_USEnglish